您的位置:易推广 > 物理仪器 > 试验机 > 摩擦磨损试验机 > 东莞市迈科仪器设备有限公司 > 产品展示 > 手机电脑试验系列 > 耐磨擦试验机 > 振动耐磨试验机

产品展示

振动耐磨试验机

点击次数:1084发布时间:2012/12/11 9:46:05

振动耐磨试验机

更新日期:2015/1/5 10:29:20

所 在 地:其它

产品型号:锝- 15(- 1502)(MK-1502)

简单介绍:振动耐磨试验机MEIKO INSTRUMENT TEST MACHINE PARAMETERSThis manual will guide the users to understand the equipment, how to use in the best conditions, how to increase productivity, how to maintain the equipment in the very simple way.

优质供应

详细内容

MEIKO INSTRUMENT TEST MACHINE PARAMETERS

                   销售QQ:                    销售旺旺:迈科仪器

This manual will guide the users to understand the equipment, how to use in the best conditions, how to increase productivity, how to maintain the equipment in the very simple way.   

 WARRANTY

1.Warraty period of this equipment is 1 year or 2000 hours whichever comes first. and warranty period of the electrical parts is 6 months.

This is based on the normal operation, operators mistake or mishandling of the equipment, excessive operation beyond its capability and failure to maintain on time will release the warranty obligation.

2. In any case that the user has changed the machine parts or corrected without any prior agreement, this warranty will be invalid..

PAINTING DURABILITY TESTER MACHINE

MODEL : TC - 15 (SM - 1502)

I. COMPOSITION OF THE EQUIPMENT

1. VIBRATORY TUMBLER

2. SOUND COVER

3. AUTO WATER & COMPOUND SUPPLY SYSTEM

4. CONTROL UNIT

II. SPECIFICATION OF THE EQUIPMENT

1. VIBRATORY TUMBLER

Tub interior dimension: W180mm x L530mm

In-put area dimension: W130mm x L530mm

LINING : Hot pour Polyurethane Casting, Thickness: 15mm

Motor : 220V x 1Hp x 3ph x 60Hz. (2 pole)

Motor R.P.M : 3500

2. SOUND COVER

L920mm x W620mm x H900mm+120mm

Top door with Gas Cylinder

3. AUTO WATER & COMPOUND SUPPLY SYSTEM

Water tank, metered to be 500ml

Water tank, metered to be 1000ml + addition of Compound 200ml

Water tank, metered to be 500ml + addition of Compound 20ml

Compound metering pump 300ml/min, adjusted to supply 200 ml by a timer.

Compound metering pump 20ml/min, adjusted to supply 20 ml by a timer.

III. UTILITY REQUIREMENT

1 Electrical Power: 220V x 1Ph (20A).

2 Tap water: 4L/Hr. (To be linked to the right side of the control unit by 8mm hose.)

IV. INSTALLATION

Just place on the flat concrete floor without any anchoring.

In case the equipment is not horizontally leveled, the mass in the tumbler can move to a side,

please be careful.

Please link 3 wires from the motor to the U.V.W. terminal in the control box.

Please link 2 wires from the main source of electrical power to the R.T. terminal in the box.

Please link tap water to the supply valve on the right side of the control box by 8mm hose.

In case Tap water contains some foreign substance, please install pre-filter before this hose.

Please link a hose(20mm) from the hose nipple on left side of the control box to the main machine.

A little longer hose is shipped with machine, please cut it off and adjust depending on

the site allocation

. Please link the discharge valve on the rear side of machine to the laboratory discharge pipe line.

Please leave the discharge valve always open except for the maintenance.

A compound container needs to be placed in the room under the control box.

Please remove the top lid and place the container in the room and put a separate lid pre-drilled

on 3 places, 1 big hole in the center and 2 small holes on the right and left.

On the center hole, please place a level sensor which emit alarm when there is not enough

compound in the container,

and on the right and left holes insert 2 hoses that come from the metering pumps.

V. OPERATION

Supply the control box with power (put the Breaker switch ON, put the disconnect switch ON) and

put the selector switch ON, then you will have light on the Power lamp.

Fill the vibratory tumbler with media 15L (11.25L of Cone and 3.75L of Pyramid).

Put the Mode to Manu and push on Start.

If the mass turns from front to back, the motor direction is correct.

In case it turns in the opposite direction please correct by changing the wire.

1. PREPARATION COURSE

The media contains some flashes and burrs. This course is, prior to the main course of testing,

to condition the media by tumbling to the right purpose of the testing.

First of all, put MODE to Manu and push on PRE WATER-1, then 500ml tank will be filled with water.

Pls push on only once, if you push on twice it will be stopped.

O Once it is full, it will be automatically disconnected. When the water is evacuated, the tank

is automatically refilled, therefore from next time, there is no need to put to Manu and fill again..

Set the timer 4 hours or 10 hours as required by your company (currently designated to be 10 hours).

Put Mode to PRE and push on Start then the tumbler will start to run and 2000 ml of water

will be supplied automatically.(4 times of 500ml)

At the time of start, 2000ml will be supplied and 500ml will be supplied every 30 min. automatically.

The tank always keeps water 500ml. and supplies when it is required.

2. MAIN COURSE OF TESTING

This course is to test whether the testing parts are safe or damaged when the media and parts

have rubbed each other in the vibratory tumbler.

First of all, put MODE to Manu and push on MAIN Water-1, then water will be ready with 1000ml

in the tank 1, push on MAIN Water-2 then water will be ready with 500ml in the tank 2.

Push on Comp-1, then 200ml of compound will be added to 1000ml of water in the tank-1.

Push on Comp-2, then 20ml of compound will be added to 500ml of water in the tank-2.

Pls push on only once, if you push on twice it will be stopped.

Once you have filled for the first time, when the liquid is evacuated, it is made again automatically

therefore there is no need to do manually again.

Set the timer 1 hour or 2 hours as required by your company.

Put the MODE to Manu and start the machine, then 1000mml of water and 200ml of compound

will be automatically supplied in the beginning and 500ml of water and 20ml of compound

will be supplied every 30 min.

(Note) When there is not enough compound, you will have Alarm light on the control panel,

please fill the container with compound.

 VI. MAINTENANCE

In case the inverter inside the control box repeats to trip, one of the 3 wires from the motor

might have been disconnected by the vibration. Please take out the vibratory tumbler from the

sound proof box and disassemble the drain pipe lines and lift up the tub and check the wires

from the motor. If any of the wires were disconnected, please correct it.

In case there is any loud noise from the vibratory tumbler, the bearings on the motor must have

broken, please replace them referring to the assembly drawing of the motor.

In case the liquid of water and compound is not supplied well, some foreign substance might have

been stuck in the ball, please clean the valve referring to the separate manual.

In case compound is not well injected from the metering pump, please clean the balls on the

suction and discharge port of the diaphragm pump.

(Referring to the separate manual, pls clean part No. 2,3,4.)

This may happen after long holidays.

Please clean the filter that is installed right after the in-put water valve on the right side of

the control box.

VII. WARRANTY & FREE REPLACEMENT

We warrant quality for either 380 days from the date of shipment or 2000 hours of operation,whichever comes first. In case any part does not work properly, we send replacement part only.PRODUCTPICTURE:

联系人:陈春华    手机:159 1768 9571

       陈春林    手机:158 1757   7758

翻译中文参数:

迈科仪器试验机参数

本手册将引导用户了解如何使用设备,在的情况下,如何提高生产力,如何保持设备非常简单的方式。

保修

1。本设备保修期是1年或2000小时,以先到者为准。与质保期为6个月的电器配件。

这是正常运行的基础上,操作者的错误或不当的设备,过度操作超出其能力和未能保持的时间将释放保修义务。

2。在任何情况下,改变了用户的机器零件或纠正没有任何先前的协议,这保证将是无效的了。

绘画耐久测试机

模型:锝- 15- 1502

我组成的设备

1。振动滚筒

2。声音盖

3。汽车复合系统

4。控制单元

。规范的设备

1。振动滚筒

浴缸内部尺寸:w180mm×l530mm

输入区尺寸:w130mm×l530mm

李宁:热浇聚氨酯浇注,厚度:15毫米

电机:220××60×3 PH 1马力。(2杆)

电机转速:3500

2。声音盖

l920mm×w620mm h900mm + 120 mm×

门顶与气瓶

3。汽车复合系统

水箱,计量为500毫升

水箱,计量为1000 ml +添加复合霜

水箱,计量为500 ml +添加复合20毫升

化合物的计量泵300毫升/分钟,调整供应200毫升的计时器。

化合物的计量泵20毫升/分钟,调整供应20毫升的计时器。

三、实用要求

1电源:220×1ph20)。

2自来水:升/小时。(是与右侧的控制单元由8毫米软管。)

四。安装

刚才的地方,在平坦的水泥地面没有任何锚。

如果设备不是横向夷为平地,大众在不倒翁可以移到一边,

请小心。

请联系3线从电机到u.v.w.终端在控制箱。

请联系2线从主要的电力来源为终端盒。

请联系自来水供应阀门在右侧的控制盒8毫米软管。

如果自来水含有一些杂质,请安装过滤器前软管。

请连结软管(20毫米)从软管接头左一侧的控制箱的机器。

长一点的软管装机,请把它关闭和调整取决于

该网站配置

。请联系该排放阀的后端机实验室排气管路。

请把排放阀常开除了维护。

复合容器需要放置在房间的控制箱。

请将上盖和容器中的房间,一个单独的盖子钻孔

3个地方,1大中心孔和2个小洞的左右。

在中心孔,请将液位传感器发出报警时没有足够的

复合容器,

和左右2孔插入软管从计量泵。

五操作

供应控制箱与电源(把断路器开关,把断开开关)和

把选择开关,你的光就必在电源灯。

填补振动与媒体1511.25l锥和3.75l角锥)。

提出的模式和推进开始菜单。

如果原来从前线回来,运动的方向是正确的。

如果它在相反的方向转请纠正通过改变线。

1。预备课程

媒体包含一些闪烁和毛刺。这当然是,之前的主要过程测试,

条件的媒体翻滚到正确目的测试。

首先,把模式吉诺比利和推前water-1 500毫升,然后将坦克装满了水。

请推上只有一次,如果你推两次将停止。

哦,一旦它是全面的,它会自动断开。当水被疏散,坦克

自动装填,因此从明年的时候,就不需要把马努和填补了。

设置定时器4小时或10小时为您所需要的公司(目前指定为10小时)。

把模式前和推不倒翁开始然后将开始运行,2000毫升的水

将自动提供(4 ml)。

在开始时的绿色,将供应500毫升将提供每30分钟自动。

坦克一直保持水和用品时,它是必需的。

2。主要课程测试

这当然是要测试是否测试是安全或损坏时,媒体和配件

把对方的振动滚筒。

首先,把马努和推模式主要water-1,水会准备一毫升

在坦克1,推上主要water-2水会准备在罐2毫升。

推进comp-1,然后200毫升的化合物将被添加到水在tank-1 1000毫升。

推进comp-2,然后水化合物将被添加到500毫升水在tank-2

请推上只有一次,如果你推两次将停止。

一旦你有了次填充,当液体疏散,它是由自动再次

因此不需要再做手工。

设置定时器1小时或2小时为您所需要的公司。

把模式菜单并启动机器,然后1000mml水和油化合物

将自动提供在开始和500毫升水和水化合物

将提供每30分钟。

(注)当没有足够的复合,你会有报警灯的控制面板,

请填写容器复合。

六、维修

在逆变器控制盒内的重复,3线的电机

可能已断开的振动。请把杯子从振动

隔音箱和拆卸排水管路,解除了浴缸和检查电线

从电机。如果任何电线断开,请改正它。

若有任何噪声振动滚筒轴承,电机必须具有

损坏,请更换指的是装配的电动机。

在案件的液态水和复合不提供,一些外国物质可能有

被困在球,请清洁阀指的是单独的手册。

在案件复合不注入从计量泵,请清洁球上

吸入和排出端口的隔膜泵。

(指单独的手册,第2部分请清洁。)

这可能发生在长时间的假期。

请清洁过滤器,安装后,输入水阀的另一边控制箱。

第七。保修和免费更换

我们保证质量或者装运日后380天或2000小时的作业,

无论哪个先来。在案件的任何部分不能正常工作,我们将更换零件只。

产品参考图片:

                      

联系我们

联系人:陈春华

点击查看联系方式

企业档案

  • 会员类型:免费会员
  • 工商认证: 【未认证】
  • 最后认证时间:
  • 法人:
  • 注册号:****
  • 企业类型:生产商
  • 注册资金:人民币**万

耳机测试系列

其他试验机设备系列

包装跌落,振动试验系列

手机电脑试验系列

弹簧试验系列

万能,拉力试验系列

可靠性环境试验系列

纸品试验系列

塑胶试验系列

线材试验系列

script>
在线咨询

提交