经过浮选得到的【钼精矿】及【焙烧】前的钼精矿都存在着【干燥问题】。特别是经过浮选的钼精矿,虽然经过了一定的过滤、压滤,其水分含量仍然很高。为便于运输及下道工序的加工,必须经过干燥,使其达到规定的含水率。钼精矿的干燥方法及使用的设备种类很多,干燥效果各不一样。
目前,江西铜业公司德兴铜矿采用了一套由【辽宁东大粉体工程技术有限公司】开发研制的一套【斯德干燥机】,对钼精矿进行干燥,取得了较好的干燥效果,该套装置在国内为首次应用,现在已充分显示出了它的优越性能,产量大,能耗低,含水率可调。德兴铜矿所生产的钼精矿是铜矿副产钼精矿,生产过程工艺条件具有一定的特殊性。所选的钼精矿内含有较多的Na、Ca等杂质成份。这些有害成份,对高温干燥过程亦有一定的影响。因此,在采用斯德干燥过程中充分注意到了这一点。利用间接换热热风炉所得到的洁净热空气去干燥钼精矿,避免增加干燥后钼精矿的含杂量。控制热风温度、流量、流速,使进入斯德干燥机内的热空气与钼精矿充分搅拌、混合。
钼精矿在斯德干燥机内呈高度分散状态存在于热空气流体中,由于钼精矿与热空气能够充分的混合,且悬浮于斯德干燥机内,因此干燥过程快而充分。该混合流体经除尘器,钼精矿被收集,含湿废气经风机排空,全过程可控。
现应用企业名录:栾川钼业集团
上海云翔矿业有限公司(上海云翔泰国公司)
朝阳金达钼业集团
江西铜业德兴矿
近20家国内外企业。
欢迎致电:张继宇 ,13904004886
Preface
At the present time most of the corporations use both reflect kilnout heating rolling kiln in
As the development of molybdenum products market, the performance of the calcinerend gas controlling effect the corporation’ benefit.
The inner heating equipments designedmanufactured by our
Process schemethe system configuration
Put the moly concentrate powder into the dryer to dryto average particle,then the dried powder be fed to the bunker by conveyor, then to the kiln. Being the source of heating air the direct heating furnace supports hot air to rolling kiln to calcining the molybdenum.
The gas of sulfur dioxide generated during the production is treated by temperature adjuster, cyclone collector, bag collector,static dust catcher. The air treated is let out. The treatment method of sulfur dioxide can be sodium sulfitelimestone. The first one cost higherthe other one is simplemuch cheaper.
The main technology is in:
1. Using direct inner heating rolling kiln to calcine can make the life of the equipment much longerheighten the thermal efficiency much.
2. The system equipped with dryer can reduce the acid materials out. As the materials being average therefore the calcining is full.
3. The system uses two collecting system the rate of collection is high.
4. The system is in the tiny negative pressure operation there is no dust out. The rate of collection is heightened.
Data of the system technologyperformance
The detail is as follows:
1. Capacity : One system produces moly oxide 7~8 ton / h.
2. sulfur content in moly oxide is ≤0.07%
3. One ton moly oxide production cost standard coal about
4. One ton moly oxide production cost electricity 280kwh.
5. Rate of collection of the dust ≥99.5%
6. The energy for the system is about 120 kw.
The details the system configuration
The details is as follows:
List of equipment
name of the system | No. | name of the equipment | quantity | remark |
drying system | 1 | sksz45 dryer | 1 set | multi-collector |
2 | feeder | 1 set | adjusting speed | |
3 | hot air furnace | 1 set | | |
4 | cyclone separator | 1 set | dump valve | |
5 | bag collector | 1 set | dump valve | |
6 | air blower | 1 set | standard | |
7 | high pressure draft fan | 1 set | standard | |
8 | draft fan | 1 set | standard | |
9 | pipelines | 1 set | temperaturepressure test | |
10 | control desk | 1 set | temperature meterspeed meter | |
source of heat system | 1 | hot air furnace | 1 set | |
2 | room of mixing air | 1 set | | |
3 | auto coal feeder | 1 set | | |
4 | slag remover | 1 set | | |
5 | machine fire grate | 1 set | | |
6 | combustion-supporting blower | 1 set | | |
calcining systemcollecting system | 1 | body of the rolling kiln | 1 set | |
| 2 | kiln head | 1 set | |
| 3 | kiln tail | 1 set | |
| 4 | conveyor bunker | 1 set | |
| 5 | discharging machine | 1 set | |
| 6 | cyclone separator | 1 set | |
| 7 | bag collector | 1 set | |
| 8 | blower | 1 set | |
| 9 | butterfly valve | 1 set | |
| 10 | electric butterfly valve | 1 set | |
| 11 | heat exchanger | 1 set | |
| 12 | pipeline system | 1 set | |
| 13 | controlling system | 1 set | |
| 14 | pulse pump | 1 set | |
price | RMB1,765,000.00 | |||
remarks | 1. designing fee RMB 100,000.00 2. training fee RMB 26,400.00 total: RMB126,400.00 |
Design time 15 work days
Manufacture time 80 ~100 days
1. Design feetraining fee RMB 126,400.00 should prepay in one time in one week.
Seller supply:
1 seller sets the engineers to the plant to direct installation, train operator, adjusttest equipments
2 seller supplies groundwork draws, process draws, pipeline connecting drawscontrolling draws.
3directing installing time are 30 workdays, adjusting times are 7 workdays
2. Buyer supplies the traveling expenses, foodaccommodation.
3. Buyer supplies cablewire from controlling board to the machines.
4. touch-up painting is led by buyer.
5. The materials that the part touches the materials being dried are made from carbon steel.
The materials that the part touches the materials being calcining are made from refractories. The conveyor is made from carbon steel.
6. Buyer supply the pipes for draft fan
7. Some parts of equipment should be welded at the locale, buyer pays for it.
8. Platform, bracket, guardrail should be made at the locale, buyer pay for it ,seller supplies the draws of them.
Remarks
Every production line is made a single system according to the buyer. The workshop would be designed for two production lines. The area for part of calcining is 24×50×
The processes will be adjusted if need.
辽宁东大粉体工程技术有限公司是在东北大学1990年成立的沈阳科技机械工业技术研究所基础上发展的,是专门从事粉体技术研究,从事干燥、煅烧、热源、浓缩技术与设备的科研产业公司和产业集团,公司由东北大学等个方面专家组成,研究和生产以旋转闪蒸干燥技术、动态煅烧技术为代表的多种干燥与煅烧设备和以高效节能热风炉为代表的热源设备。先后有十几种产品技术获省、市、国家级奖励和国家专利。闪蒸干燥技术成为国内唯一获国家级新产品,国家火炬计划项目,有近400余台设备在国内外使用。公司具有雄厚的科研与制造能力,在热能技术及成套工程建设方面有多年经验,在涉及各种干燥、煅烧、热源、浓缩等领域将承接工程设计、提供专用配套设备与系统以满足各方需要。 公司努力创造人,创造技术,把从事的技术、产品做得更好,水平更高,更符合时代发展。
① 凡本网注明"来源:易推广"的所有作品,版权均属于易推广,未经本网授权不得转载、摘编或利用其它方式使用。已获本网授权的作品,应在授权范围内
使用,并注明"来源:易推广"。违者本网将追究相关法律责任。② 本网凡注明"来源:xxx(非本网)"的作品,均转载自其它媒体,转载目的在于传递更多信息,并不代表本网赞同其观点和对其真实性负责,且不承担此 类作品侵权行为的直接责任及连带责任。如其他媒体、网站或个人从本网下载使用 ,必须保留本网注明的"稿件来源",并自负版权等法律责任。
③ 如涉及作品内容、版权等问题,请在作品发表之日起两周内与本网联系,否则视为放弃相关权利。
④易推广页面显示产品信息均由企业自主发布,信息内容真实性、准确性与合法性由相关企业负责,易推广对此不承担任何责任,如遇非法或侵权信息欢迎监督,请联系QQ:1273397930或者发邮件至:1273397930@qq.com,如有确实证件证明属实,本站将对其删除处理,谢谢!
⑤ 本信息由注册会员:辽宁东大粉体工程技术有限公司发布并且负责版权等法律责任。
易推广客服微信